Notification Rue Wenkel and surroundings | 23.-27.10.2023 > Asphalting of the roadway
Road closure
Rue Wenkel
- Monday, October 23, 2023 from 7:00 a.m. until Friday, October 27, 2023 at 12:00 p.m.
Inersection Rue St. Nicolas – Rue Wenkel
- Monday, October 23, 2023 from 7:00 a.m. to 6:00 p.m.
- Thursday, October 26, 2023 from 7:00 a.m. to Friday, October 27, 2023 at 12:00 p.m.
Intersection Rue Wenkel – Rue Dicks – Wueswee
- Monday, October 23, 2023 from 7:00 a.m. until Friday, October 27, 2023 at 12:00 p.m.
No parking
From Monday, October 23, 2023 from 7:00 a.m. until Friday, October 27, 2023 at 12:00 p.m.
- Rue Wenkel
- Wueswee
- Rue Dicks (the first 2 parking spaces))
Access to the garages
Access to the garages on Rue Wenkel will not be available for the duration of the construction.
Waste disposal
The collection of household and organic waste will take place as usual on Tuesday, October 24, 2023.
Temporary bus stop Rue Dicks | Prolongation
Due to construction work on Rue de la Cité, bus stops on Rue Maatebierg will be moved to Rue Dicks near Cave Desom until further notice.
This message concerns the RGTR, school bus and city shuttle services.
Temporary traffic rules | Construction site rue de la Cité
Construction site Cité Buschland | Traffic information
Information regarding the temporary traffic lights near the intersection Rue de la Cité / Rue Maatebierg / Rue Dicks
Due to the construction works of the new retention basin, it was not possible to maintain the sidewalk. In the meantime vehicles and pedestrians have to share the road, which required the installation of a classic traffic light system to ensure safety.
Vehicles & bikes
Traffic is regulated by traffic lights equipped with a system that detects the presence of a vehicle in both directions. This enables a better flow of traffic. Yellow lines along the road indicate the stopping and/or waiting zones.
Pedestrians
Pedestrian passage through the construction site area is regulated by a two-color traffic light system. The pedestrian must stop in front of the traffic light, press the button and wait until the pedestrian light turns green. There is enough time for the pedestrians to safely cross the construction zone.
Please follow the various traffic signs along the construction site and use the crosswalks to get to the other side of the street.
The pedestrian walkway between house numbers 12 and 22, rue de la Cité is closed to all pedestrian traffic. Please use the sidewalk on the opposite side of the street to reach the push button for the pedestrian lights when walking down.
Service technique
Service circulation
Chantier | Réaménagement rue Wenkel – phase 2
Route barrée
- Rue St. Nicolas (à l’intersection de la montée de la Chapelle jusqu’à l’intersection rue Foascht) | 25.10 – 05.11.2021 : Route barrée
- Rue Wenkel (à partir de la maison N°20 jusqu’à l’intersection de la rue St. Nicolas | 30.10 – 05.11.2021 :Route barrée
Stationnement interdit | 30.10 – 15.11.2021
- Parking rue Dicks (sur tout le parking)
- Rue Wenkel (devant les immeubles 16a – 20, rue Wenkel)
- Parking des Sports (moitié côté gauche)
Chantier | Rue Enz (jusqu’au 26.02.2022)
Rue Enz – Stationnement interdit, passages pour piétons provisoires
- Début des travaux : 30/08/2021
- Fin des travaux : 26/02/2022